| | Abandonment and Sale of Street or Alley |
| |
| |
| |
| | 1. Applicant's Information |
| |
| |
| | |
| | | |
| |
| | | | |
| | |
| |
| |
| |
| | | |
| | |
| |
| | |
| | | |
| |
| |
| | | | |
| | |
| | |
| | |
| |
| |
| | | |
| | | heather.caramanica@centerpointenergy.com |
|
| |
| |
| | |
| | | |
| | |
| |
| | | |
| | | | |
| | |
| |
| | | |
| | | |
| | | |
| |
| |
| | |
| | | |
| |
| |
| | |
| | | |
| | |
| | |
| |
| | | | |
| | |
| |
| | | |
| |
| |
| |
| | |
| |
| |
| |
| |
| |
| |
| |
| | | |
| |
| |
| |
| |
| |
| |
| | | |
| | 3.Key Map Location of area of your request |
| |
| |
| |
| | |
| | | |
| |
| | |
| | 5. Description and square footage of requested street or alley to be abandoned and sold. |
| |
| |
| | Fennell Street right-of-way, 80 feet wide by 320 feet long; total of 25,600 square feet |
|
| |
| | 6. Legal description and address of the property abutting the portion of the street or alley to be abandoned and sold, by lot and block, including the name of the subdivision. If the property is not located in a platted subdivision, provide the name of the survey and the abstract number |
| |
| |
| | BLOCK 62 & 63, OF HARRISBURG, VOL.6 PG.201 H.C.D.R. SITUATED IN THE JOHN R. HARRIS LEAGUE, ABSTRACT NO. 27 |
| |
| |
| 7. Statement of intended use and details of the requested street or alley to be sold, by lot and block, including the name of the subdivision. If the property is not located in a platted subdivision, provide the name of the survey and the abstract number |
| |
| | Block 62 and 63 have been acquired by CenterPoint Energy via eminent domain. Location will be used for an electric distribution 138 kV substation. This substation will replace existing 69 kV Harrisburg Substation. The Fennell St. street closure is necessary due to the planned placement of facilities on both tracts. Homeland Security requires that critical infrastructure be fenced and secured from the public, so the perimeter of both tracts, including the road, need to be fenced. |
|
| |
| | 8. Is there a site plan if the property will be redeveloped? If so, please include a copy of the site plan with this application. |
|
| |
| | Preliminary substation design attached. Engineering and site plan to be complete by second quarter of 2023. |
|
| |
| | 9. What is the timeline for proposed redevelopment ? |
|
| | Site prep is to commence fourth quarter of 2023. Construction is to begin first quarter to third quarter of 2024. Energization is to be by fourth quarter 2024. |
|
| |
| | 10. What is the timeline to vacate the property if the property is currently occupied? |
|
| |
| | Block 62 and 63 are both currently vacant. A sanitary sewer line, drainage sewer, water line, and CenterPoint gas line need to be re-routed from under and within Fennell St. ROW. CenterPoint will assume all costs for re-route. Requesting city guidance on re-route of facilities. Site prep is expected to commence 4Q 2023. Construction to commence 1Q 2024. |
|
| |
| | 11. Description and square footage of any property interest to be conveyed to the City by the applicant |
|
| |
| | If easements are to be conveyed to the City, easements will be determined by the relocation of facilities based on City of Houston's recommendations. |
|
| |
| | 12. Other abutting property owners (if applicable) |
| |
| |
| | | |
| | | |
| |
| |
| |
| |
| |
| |
| |
| | | | |
| |
| |
| | | |
| | |
| | |
| | | |
| | | |
| |
| | | |
| | |
| |
| | | | | |