| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | |
| | Abandonment and Sale of Street or Alley |
| |
| |
| |
| | 1. Applicant's Information |
| |
| |
| | |
| | | |
| |
| | | | 6161 Savoy Drive, Ste. 1111 |
|
| | |
| |
| |
| |
| | | |
| | |
| |
| | |
| | | |
| |
| |
| | | | |
| | |
| | |
| | |
| |
| |
| | | |
| | | |
| |
| |
| | |
| | | Panjwani Energy Properties, LLC |
|
| | |
| |
| | | |
| | | | |
| | |
| |
| | | |
| | | |
| | | |
| |
| |
| | |
| | | |
| |
| |
| | |
| | | |
| | |
| | |
| |
| | | | |
| | |
| |
| | | |
| |
| |
| |
| | |
| |
| |
| tlewis@centuryengineering.com |
|
| |
| |
| |
| Century Engineering, Inc. |
|
| | | |
| |
| |
| |
| |
| |
| |
| | | |
| | 3.Key Map Location of area of your request |
| |
| |
| |
| | |
| | | |
| |
| | |
| | 5. Description and square footage of requested street or alley to be abandoned and sold. |
| |
| |
| | Alley, 12 foot wide by 120 foot long; total of 1,440 square feet. |
|
| |
| | 6. Legal description and address of the property abutting the portion of the street or alley to be abandoned and sold, by lot and block, including the name of the subdivision. If the property is not located in a platted subdivision, provide the name of the survey and the abstract number |
| |
| |
| | 6902 N. Main St., Lots 1-5, Block 6, Sunset Heights and 633 E. 29th St. Lots 6-13 Block 6, Sunset Heights, Located in the John Austin Survey, Abstract No. 1, Harris County, Texas. |
| |
| |
| 7. Statement of intended use and details of the requested street or alley to be sold, by lot and block, including the name of the subdivision. If the property is not located in a platted subdivision, provide the name of the survey and the abstract number |
| |
| | Owner has purchased lots east and west of the 12-foot-wide x 120-foot-long alley and is sole owner of all abutting property. Owner intends to build a gas station and convenience store. All lots are to be combined into one reserve by plat and the alley now serves no purpose. All CenterPoint Energy utilities are being removed or relocated from the alley. We have a No Objection Letter from AT&T, but there are no AT&T or Comcast utilities located in the Alley. |
|
| |
| | 8. Is there a site plan if the property will be redeveloped? If so, please include a copy of the site plan with this application. |
|
| |
| | Yes. The site plan for a gas station and convenience store will be included with this application. |
|
| |
| | 9. What is the timeline for proposed redevelopment ? |
|
| | |
| |
| | 10. What is the timeline to vacate the property if the property is currently occupied? |
|
| |
| | This property is vacant. Existing vacant house will be demolished before construction starts. Existing billboard signage (large sign) along Loop 610 is under short term lease (month to month) and a source of income while plat, plans and permits are approved. Billboard will be demolished before construction starts. |
|
| |
| | 11. Description and square footage of any property interest to be conveyed to the City by the applicant |
|
| |
| | |
| |
| | 12. Other abutting property owners (if applicable) |
| |
| |
| | | |
| | | |
| |
| |
| |
| |
| |
| |
| |
| | | | |
| |
| |
| | | |
| | |
| | |
| | | |
| | | |
| |
| | | |
| | |
| |
| | | | | |