Review

Abandonment and Sale of an Easement
Steve Horn
One William Center One William Center Tulsa OK 74172
9185747939
steve.horn@magellanlp.com
Magellan Pipeline Company, L.P. and V-Tex Logistics LLC
Sr. R.E. Rep.
Lance Jack
13810 Champions Forest Dr. Ste.256 Houston TX 77069
832.727.4118
ljack@ufsrw.com
Univerasal Field Services
Sr. Permit Specialis sr/wa
453M
H
Questions
Description and square footage of requested easement to be abandoned and sold (Example: Water line easement, 20 feet wide by 200 feet long;total of 4,000 square feet):
Legal Description and address of the property abutting the portion of the easement to be abandoned and sold,by lot and block,including the name of subdivision. If the property is not located in a platted subdivision, provide the name of the survey and the abstract number(Example: 123 First Street, Lot 5, Block 3, Western Heights Subdivision or Tracts 1A and 3C, Obedience Smith Survey, a-56):

Statement of intended use and details of the requested easement to be sold

Is there a site plan if the property will be redeveloped? If so, please include a copy of the site plan with this application

What is the timeline for proposed redevelopment?

What is the timeline to vacate the property if the property is currently occupied?

Description and square footage of any property interest to be conveyed to the city by the applicant ( Example:Sanitary sewer easement, from First Street to Second Street that is 10 feet wide by 50 feet long totaling 500 square feet):
If there are any agreements or negotiations for an agreement from other departments within the City associated with this request, please attach a copy of the agreement to this form :
Attachments
A clear 8.5 x 11-inch drawing or map of the requested property interest highlighted in different colors or cross-hatched in different patterns, with a legend indicating property owned by other abutting property owners (if applicable) and the property requested to be sold.
One recently dated aerial photograph of the subject area.
Three different, full size, recent, clear photographs of the subject area taken from different directions or point of view marked or otherwise indicating the requested property in relation to reference points such as streets, the applicant's property, etc.
The subdivision plat,deed, or legal instrument that dedicated or conveyed the City's or public's ownership of the requested property interest, in a clearly readable form with the recording information. The subdivision plat must be large as necessary to accommodate the map and dedicatory language on one page.
Harris County Appraisal District printouts showing the applicant's property ownership, the City's ownership, any other abutting property owner's ownership if applicable.
Surveys or City drawings of the subject area if available.
Current title report of the parent tract.
Site plan of current and proposed project ( if available).
Miscellaneous
Date Comments Status Name Role
1/12/2018 12:00:11 PM Submission is for right of entry for survey studies, prior to attaining an easement for 20" pipeline within the Center Point Energy transmission right of way. Applicant Review Lance Jack Agent
1/19/2018 12:19:29 PM Submitted Steve Horn Applicant
1/22/2018 2:11:29 PM The Joint Referral Committee (JRC) will accept an application for the sale of an easement for the above captioned tentative project. However, the JRC is not in a position to provide a Right-of-Entry for the purpose of gaining access to do preliminary work before the request for the sale of easement. Thank you, Rejected Real Estate Intake Agent
1/25/2018 8:13:18 AM There seems to be a monumental misunderstanding. This application has been provided as instructed to receive an easement, then attain certain access for survey work. We are not requesting the committee to provide permission for survey. There will be no physical work performed on the easement of Center Point Energy. It was our understanding, that we must attain an easement 1st which is a definite requirement to receive rights to place the pipeline. However, we do presume this will provide limited ingress and egress to the surface for engineering purposes. We will resubmit the application but also request that reconsideration be provided or an exception be allowed within this application due to misunderstanding of the nature of its purpose. Applicant Review Lance Jack Agent
1/25/2018 8:16:19 AM There seems to be a monumental misunderstanding. This application has been provided as instructed to receive an easement, then attain certain access for survey work. We are not requesting the committee to provide permission for survey. There will be no physical work performed on the easement of Center Point Energy. It was our understanding, that we must attain an easement 1st which is a definite requirement to receive rights to place the pipeline. However, we do presume this will provide limited ingress and egress to the surface for engineering purposes. We will resubmit the application but also request that reconsideration be provided or an exception be allowed within this application due to misunderstanding of the nature of this application. Submitted Steve Horn Applicant
2/1/2018 8:07:29 AM Rejecting due to request for a right-of-entry not sale of easement. Rejected Real Estate Intake Agent